Tuesday, June 8, 2010

Ida Lee Pool in Leesburg, VA






Contractor: R E Daffan
Scheduling Engineer: Tom Smithey, HICAPS Inc.


HICAPS provided scheduling for the Ida Lee Pool project. The pool had a ribbon cutting ceremony in May 2009 and has numerous exciting features. The pool has just opened for its 2010 season on May 29th. This is one of many projects that HICAPS has provided scheduling services for R E Daffan.

Features include:

o 600’ Lazy River

o Large slide Tower with Two Body Flumes

o Drop Slides

o Crossing Feature

o Two Gang Slides

o Little Squirt Whale

o Large “Beach” Area with Bubblers and Water Fountains

o 25 yard Lap Lanes

o Dumping Buckets

o Water Pipe Fall

o Shade Structures

o Concession Stand
o Grass Picnic Area

o Floating Snake and Alligator

No comments:

Post a Comment