Wythe County Virginia has broken ground on a project that will double the size of its Social Services Building. The building will include a new 911 Dispatch Center in the lower level and new Administrative Offices on the 2nd and 3rd levels. South End Construction Company – Roanoke Virginia is the General Contractor. HICAPS is working closely with South End on this project to assure that it finishes its two phases. Elevator and Stair Tower turn over is scheduled for June 2011 and the Building completion is projected for January 2012 after which the 911 Call Center and the administrative offices for Wythe County Health and Social Services will move in.
Showing posts with label scheduling. Show all posts
Showing posts with label scheduling. Show all posts
Friday, March 18, 2011
Wythe County Expands Social Services with a new 911 Dispatch Center
Tuesday, June 8, 2010
Ida Lee Pool in Leesburg, VA


Contractor: R E Daffan
Scheduling Engineer: Tom Smithey, HICAPS Inc.HICAPS provided scheduling for the Ida Lee Pool project. The pool had a ribbon cutting ceremony in May 2009 and has numerous exciting features. The pool has just opened for its 2010 season on May 29th. This is one of many projects that HICAPS has provided scheduling services for R E Daffan.
Features include:
o 600’ Lazy River
o Large slide Tower with Two Body Flumes
o Drop Slides
o Crossing Feature
o Two Gang Slides
o Little Squirt Whale
o Large “Beach” Area with Bubblers and Water Fountains
o 25 yard Lap Lanes
o Dumping Buckets
o Water Pipe Fall
o Shade Structures
o Concession Stand
o Grass Picnic Area
o Floating Snake and Alligator
Friday, June 4, 2010
HICAPS Inc. Scheduling Project Updates
Branch & AssociatesMontgomery County Public Schools
Montgomery County, Virginia
Construction Update
Project Manager: Greg Polcha
Superintendent: Steve Nicely
Shawsville Elliston Elementary School is Scheduled to open in the fall. We will be substantially complete by the end of June.
Branch and Associates of Roanoke is the project contractor.Project Manager: Heather Bowman
Supertintendents: Dale Sherburne and Pat Benton
HICAPS Inc. is provding scheduling
The concourse level, footings and columns are poured. We are at the 31 ft level and will be starting the precast seating.
Vist the Branch and Associates link for more project information and view the real time camera of the stadium progress.
Tuesday, April 13, 2010
Liberty University Stadium Construction

Branch and Associates of Roanoke is the project contractor.
Project Manager: Heather Bowman
Supertintendents: Dale Sherburne and Pat Benton
HICAPS Inc. is provding scheduling. Tom Smithey is the scheduling engineer.
Branch and Associates is working multiple shifts, 7 days a week. Projected completion date is September '10.
The demolition of the 21-year old facility is the first step toward construction of the new five-story suite and press tower that will overlook an expanded Williams Stadium for the 2010 football season.
The following is from a press release detailing the stadium construction:
The first of a three-phase plan calls for the addition of 6,600 seats added to the west side of the stadium, plus a 34,000-square foot press box. The brick and glass encased, Jeffersonian-style four-story tower will house club-level seating for qualified Flames Club donors, 16 permanent luxury suites, a banquet room which can hold up to 500 people, a 1000-seat classroom and a state-of-the-art press area. “The expansion of Williams Stadium will have a monumental effect on Liberty University and its football program,” stated Jeff Barber, Liberty’s Director of Athletics. “Above all else, this shows a great commitment from the University, and when you have a commitment, a lot of wonderful things can happen.”
Phase One of the plan is part of a multiphase effort to boost the stadium’s seating from its current capacity of 12,000 to 30,000 over the next five years. Phases Two and Three will add a new 4,000-seat middeck for the east side of the stadium and 6,400 seats in a horseshoe-shape area surrounding the end zone in the south end of the stadium. When all three phases are complete, the stadium will have undergone an estimated $22 million in improvements. The renovated facility will also ready the stadium for the future construction of upper desks on the west and east sides of the stadium that will bring the capacity to 60,000.
Thursday, December 17, 2009
Branch Newsletter Market Street Garage Update
From this
to this

to this
Anyone familiar with the Roanoke City Market is familiar with the Market Street Parking Garage. Located at the intersection of Church and Market, the garage was stark and uninviting prompting many shoppers to park elsewhere or worse, not visit the market. Structural problems and the need for additional parking prompted the city to embark on renovating the structure. With its makeover almost complete, the Market Street Parking Garage will enhance the market district with a design more in keeping with surrounding architecture. Designed by Walter Robbs Callahan & Pierce Architects of Winston-Salem, NC, the project is on schedule to be completed in March 2010. HICAPS is providing the scheduling services.
Tuesday, October 27, 2009
New Elliston-Shawsville Elementary School
Branch & AssociatesMontgomery County Public Schools
Montgomery County, Virginia
Construction Update
Project Manager: Greg Polcha
Superintendent: Steve Nicely
The New Elliston-Shawsville Elementary, located at 8561 Roanoke Rd, Elliston, VA, consists of a single story structure, with three mechanical mezzanines located within various attic spaces throughout the building. This 106,000 sf building consists of a central core that contains an administation area, media center, cafeteria/auditorium, gym and art rooms. There are two seperate classroom wings that raidate from the core. The building structure is masonry on cast in place concrete footings. The roof sturcture is a mix of light gauge metal framing and metal roof trusses. The exterior consists of three colors of architectural brick as well as architectural pre-cast concrete. The completion date is May 28, 2010. HICAPS is providing scheduling services for this project. HICAPS has worked with Branch & Associates on a number of projects. Please visit their webiste at www.branch-associates.com .