Showing posts with label CPM Scheduling. Show all posts
Showing posts with label CPM Scheduling. Show all posts

Wednesday, June 1, 2011

Making Smart Choices for a Sustainable Project

Green or Sustainable construction is a hot button topic these days. In our blog discussion on making choices that make $ense, solar options seem to be a more and more popular choice today for a renewable energy source. As always we are a proponent of planning. In the planning stage you will determine if this is the right option for your project and budget. Doing your homework will save you time and money later in the project. Below are good steps to follow as a rule of thumb to ensure solar is right for your project.


STEP 1 - FEASIBILITY:
·    Feasibility analysis – Be sure this will fit the OPR (Owners Project Requirements)
·    Preliminary proposal – Pricing is another key component
STEP 2 - FINANCING:
·    Available incentives (tax credits, accelerated depreciation, state and utility solar rebates)
·    Financing options, if needed (e.g. leases and power purchase agreements)
·   Non-tax based incentives: Incentives offered through local power companies.
STEP 3 - SITE PLANNING AND DESIGN:
·     System Design-Have a strategy in place
·     Project planning: Working with all parties involved in the project (perspective and feedback)
·     Analysis, scheduling and planning-tools
STEP 4 - PROCUREMENT AND INSTALLATION
·     Procurement of materials-Do some investigating and pricing
·     Solar Panel Installation-Use reputable firms with the qualifications to do the project
·      Inspections
·     System commissioning and testing

STEP 5 - OPERATIONS AND MAINTENANCE
·     Training of facilities personnel (system monitoring and maintenance)
·     Administration and execution of all warranty coverage
·     Field service and technical support, if required

Following these steps and knowing what the ROI (Return on Investment) will be, eliminates the unknown and unpleasant surprises. A significant portion of the commercial solar system's cost is paid for by taking advantage of state rebates, incentives and the 30 percent federal solar tax credit / grant and accelerated depreciation which makes this a good time to consider going solar if it fits.
Gabriele Medley-Harry, LEED AP BD&C
Director of Sustainable Construction
HICAPS, Inc.

Thursday, June 17, 2010

Scheduling Services




















HICAPS has teamed with R E Daffan to provide scheduling for the new Navy Fed. Credit Union Branch Located on Rte. 17 Chesapeake, VA. The new credit union is scheduled to open in July.

R-E Daffan Inc. (Branch Group) Supt. Chuck Johnston.


PM Mike Donohue

HICAPS, Inc. - Scheduling - Tom Smithey

Monday, October 19, 2009

Brindley Construction, LLC

During the period beginning February 2008 through May 2009 the manufactured housing production facilities for Southern Energy and Southern Estates divisions of Clayton Homes at Addison, Alabama were expanded significantly, nearly doubling the production capabilities at this location.

Brindley Construction retained HICAPS, Inc. of Greensboro, NC to assist with schedule development and maintenance on this project. Initial project schedules were developed with the Brindley Project Team and with the Clayton Homes Production Managers that considered not only the expansion of the new facilities but recognized that production at both the Southern Energy and Southern Estates Plants could not be interrupted. Schedules were updated with the Brindley Team and the Subcontractors bi-weekly through out the project. Bi-weekly and monthly review meetings were also held with the Clayton Production Managers. Owner’s moves, equipment installations, and construction of specialized production line fixtures were incorporated in to the schedules.

This highly coupled project was phased around production schedules, planned production shut downs, and holidays. In addition to the plant expansions new offices, break rooms and restroom facilities were constructed.

The office construction, like the production plant expansions, was required to be constructed in phases and completed on schedule so that office moves could be accomplished during planned shut down times.

Because the old break rooms and toilet facilities were being demolished and replaced with new facilities phasing of these renovations was also required so that there would be break rooms and restroom facilities continuously available for the plant employees.

Sitework which included new drainage structures, roads, lighting, utility work and other improvements had to be coordinated with the production schedules. Utility interruptions including the new 2500 Amp Electrical Service to the Southern Estates Plant could only occur during planned shut downs. New manufactured housing staging areas were constructed to take the place of previously existing staging areas which would now be occupied by the expanded plants. Significant amounts of unsuitable soil encountered on the site caused the development of recovery schedules so that Brindley’s operations would not impact production in either plant.

Scheduling the delivery of the more than 10 separate buildings and additions was also a critical consideration because of limited lay down space available during the project.

Even with all of the challenges faced by the Brindley Construction Team and the Production Managers for Clayton Homes which included maintaining production schedules in the active plants, unsuitable soil encountered, code required structural upgrades and weather impacts the project successfully completed within the original contract period.

If you would like more information on Brindley Construction LLC you can visit their website at www.brindleyconst.com or Clayton Homes at www.claytonhomes.com .

Thursday, October 15, 2009

Meet the Partners Building Diagnostics Part IV

The cornerstone of HICAPS for the past 25 years has been CPM Scheduling and Project Controls. It is our firm belief that with good information, controls and planning, every project has an equal chance of success. Along with the scheduling and project controls as our foundation, we are also well known for our engineering, estimating, construction and claims resolution experience. Now we have added another service as a natural out growth of the our area of expertise.

HICAPS Building Diagnostic Services was conceived out of a need expressed by our clients. HICAPS has performed Building Diagnostic Services as part of the claims resolution service and performed a number of condition assessments for our clients in the past. To perform these services we tapped into our own knowledge base of the envelope and reached out to the known experts that we had worked with in the past for roofing, Infrared Theromography, Nuclear Moisture Surveys, HVAC and Electrical Analysis and Architectural services.

Because of his experience and credentials, Tom Smithey, who has been with HICAPS since 1999, was chosen as the Program Director for the Building Diagnostics Division. To is a graduate of the Building Construction Program at Virginia Tech and is a Certified Professional Constructor. Tom holds GC licenses in several states and is a LEED AP. We are proud of our team and happy to be able to offer such an important service.

Friday, September 25, 2009

Meet the Partners of HICAPS Building Diagnostics

The cornerstone of HICAPS (Hood Information Control and Planning Systems) for the past 25 years has been CPM Scheduling and Project Controls. It is still our firm belief that good information, controls and planning give every project the highest chance of success. In 2007 we added another service as a natural outgrowth of our other areas of expertise. Building Diagnostics is something HICAPS’ has done as part of our claims resolution services and was a natural fit. As part of the best value concept we wanted to offer a one stop shopping approach. When we made the commitment to make Building Diagnostics a mainstay service, we reached out to the known experts that we had worked with in the past and invited them to become partners in a cooperative effort. We are proud of our association with FCG (Facility Consulting Group), HCR (Hummer Construction Resources) and West and Stem Architects.

We wanted to introduce you to our partners and decided that we would post a bio on each of our partners. We will focus our next three blogs on our partners, beginning with Facility Consulting Group (FCG). FCG has been in business since 1993. Their role in HICAPS Building Diagnostic Services is primarily the roof areas. Using thermographic imaging equipment to locate faulty electrical panels and equipment within the building. Infrared Thermography is an important aspect of building diagnostic services. Using this technique deteriorating components can be indentified prior to failure. Moisture is one of the major factors to be considered in building diagnostic surveys. Once moisture makes its way into building materials, structural integrity deteriorates and becomes a breeding ground for mold. Our goal is to help preserve buildings and equipment through preventive maintenance. This is accomplished through a dedicated staff of trained, experienced professionals with the ability to assess and evaluate entire facilities using state of the art methods and equipment.

FCG decided to become a partner based on the strength that each of the companies brings to the group.
The dark area indicates a moisture issue.

Wednesday, July 22, 2009

Longwood University Heating Plant Update



HICAPS, Inc. was contracted by Branch & Associates, Inc. about one year ago to do the scheduling for Longwood University-Heating Plant (1 new boiler, relocating a second boiler and providing for a future (3rd) boiler) in Farmville, VA. This includes the new Boiler House construction and new AFS boiler. This project will construct a replacement central steam plant. The plant will provide steam to 98% of the campus. The new plant will consist of three wood-fired boilers with a rating less than 30,000 lbs of steam per hour, fuel handling storage system, fuel handling system and other support equipment.
The project will include a new building sited on Barlow Field. The primary fuel will be sawdust, a low-polluting, renewable bio-mass.


AFS Boiler

The new boiler is an AFS Biomass Renewable Energy Wood Dust Fired Boiler and Injection Stoker Fire Box utilizing sawdust as its primary fuel. The sawdust comes from local sawmills and is part of the renewable energy steam generation plant at Longwood University, Farmville VA. For more on AFS AFS Energy Systems Division Inc click the link.


Boiler House

Monday, May 11, 2009

Moses Cone Health Systems, Greensboro, NC


PROJECT DESCRIPTION
HICAPS provided Owner’s Representative/ Construction Management services for over 16 multiple concurrent projects.


HICAPS’ SERVICES
• Construction Manager / Owner’s Representative
• On-site Project Management
• Cost Estimating
• Customer / Design Coordination
• Bid Process Management
• Value Engineering Management
• Construction Management
• Schedule Management