Thursday, January 31, 2013

VISN 11 MATOC Update


This is a follow up to our January 24th post to provide progress photos of the Upgrade Cooling Tower Effeciency Project located in Indianapolis, IN .

 

 HICAPS Project Manager David Yates provided photos of the recent progress of the project.

 

    Concrete basin lid pour complete



Structural steel to support cooling tower being installed on lid


 

Structural steel to support cooling tower being installed on lid

 
 

CW piping being assembled on site


Monday, January 28, 2013


 
 
GSA Buildings – HICAPS just completed three GSA building projects providing LEED Construction Phase services. Blue Ridge Enterprises was the GC on the projects.

GSA US Citizenship and Immigration Services, Greer, SC - HICAPS provided LEED administration and management services for the construction of an 11,360 sf building under LEED CI v2009 Certified level.

GSA SSA Hickory, NC - HICAPS provided LEED administration and management services for the construction of a GSA Social Security Administration Office consisting of a 15,775 sf building under LEED NC v 2009Silver level.

GSA SSA Goldsboro, NC - HICAPS provided LEED administration and management services for the construction of a GSA Social Security Administration Office consisting of an 11,656 sf building under LEED NC v 2009 Silver level.
For more information on LEED Construction Phase administration and management services email gabriele@hicaps.com or call 336-665-1234.

Friday, January 25, 2013

VISN 11 MATOC


January 24, 2013 - HICAPS is currently executing two task order projects within our VA VISN 11 MATOC with our teaming partner Shiel Sexton. One of the projects entitled “Upgrade Cooling Tower Efficiency” consists of removing and replacing a cooling tower at the Roudebush VA Medical Center in Indianapolis, IN. The project value is $2.4M and is slated to complete mid-March 2013.  This facility has a total of two towers with a total of 5 cells. This project entails removing one of the towers having two cells and replacing with a new efficient tower. The three cell tower is to remain and was left in operation until late Dec. 2012 when temperatures consistently remained below 50 degrees. Along with demolition of the two cell tower and associated concrete basin, an existing screen wall with foundations was demolished and will be replaced at the end of the project. Once demolition of the tower and basin was complete, excavation began to allow for the new concrete basin and lid. The concrete basin and lid have been poured with structural steel installation to support the tower mounted on the lid occurring during the end of Jan. 2013. The extreme cold temperatures in Indianapolis during concrete pours added an extra challenge to ensure consistent cure times and temperatures and the avoidance of thermal shock. The cooling tower delivery and erection is scheduled to begin Jan. 28 and will have a 2 week duration. During erection of the new cooling tower, the existing tower will be connected to the new CW piping and pumps. It is scheduled to be back in operation early Feb. 2013. Once the erection of the new tower is complete it will be connected to the CW piping/pumps and will be well on the way to commissioning and turnover to the VA.  

Wednesday, January 23, 2013

Bridgestone Project Aiken SC

Aiken, SC - HICAPS was chosen by Brasfield and Gorrie as the “General Trades” contractor for Area 100 of the new 1.5 million square foot Bridgestone ORR plant in Aiken, SC.  HICAPS’ work will consist of rough carpentry, casework, metal stud framing/drywall, painting, flooring, hollow metal, overhead doors, and equipment lifts for approximately 350,000 square feet of the new tire manufacturing facility.  The work package is currently valued at $3,005,000 and is scheduled to be completed by July of 2013. Mark Koenig with HICAPS is the Senior Project Manager for this project.

Tuesday, January 22, 2013

Greensboro, NC January 18, 2013 – HICAPS Open House Event





HICAPS would like to thank all our wonderful guests who came out and attended our Open House Event on Friday January 18th.  The weather certainly brought some surprises. However that did not stop the good times. Wow, what a great open house event! We enjoyed steamed oysters and other goodies while enjoying the great experience of spending time with our guests. We look forward to a very successful 2013.

Monday, January 14, 2013

HICAPS Open House and Customer Appreciation






HICAPS OPEN HOUSE AND CUSTOMER APPRECIATION EVENT
Please RSVP by January 14, 2013

  • Friday, January 18, 2013 • 3:00PM
  • Hosted by HICAPS
  • 336-665-1234
  • 600 N Regional Rd
  • Greensboro, NC 27310

  • HICAPS would like to show our appreciation for our 
  • clients, partners and colleagues. Come enjoy oysters 
  • and snacks while meeting professionals in our industry 
  • and building new relationships.