Showing posts with label Completed Projects. Show all posts
Showing posts with label Completed Projects. Show all posts

Tuesday, May 12, 2009

Aldagen Clean Room Project

HICAPS was hired by Aldagen Corporation to provide design-build (general contracting) services for a new state of the art clean room complex to meet their new process production requirements, FDA standards, and ISO 14644-1 air quality standards. The facility is approximately 5,400 sf with multiple sorting and production rooms, gowning and de-gowning facilities, lab space, bathrooms and a viewing corridor. The complex will be used as a production site for a new medical procedure that extracts adult stem cells from patient’s bone marrow. These stem cells are used to regenerate heart muscle in heart attack patients and to regenerate blood vessels in diabetic patients suffering from poor blood circulation. The clean room complex is a building within a building concept, with extensive electrical and HVAC systems to include a HEPA filter fan system and a 120 KW backup generator.


The design and construction of this facility was completed in four months to FDA standards and met ISO air quality standard classes 6, 7, and 8 in individual areas. The quality of the facility exceeded Aldagen’s expectations. Due to the outstanding design and the level of cleanliness maintained during construction, the rooms in the complex were certified one to two classes higher than called for in the contract. This has allowed Aldagen to meet European Union Standards in addition to US Standards, which is desirable for future certifications. HICAPS is proud to have a part in bringing this break-through medical procedure to the public.

Monday, May 4, 2009

Project: Penn National Insurance

The complete renovation of this existing two-story, 45,000 sqft office building included new mechanical, electrical and plumbing systems, as well as roof, exterior finish and interior finishes.

HICAPS’ SERVICES
• Construction Manager / Owner’s Representative
• On-site Project Management
• Cost Estimating
• Bid Process Management
• Value Engineering Management
• Construction Management
• Schedule Management
• Move-in Coordination
• Project Closeout

Saturday, May 2, 2009

2003 Bond Project – Guilford County Schools


Northern Guilford Middle School and Northern Guilford High School
This 120 acre site is now home to a 285,000 sqft high school, a 140,637 square foot middle school, stadium, ball fields, and sustainable design features.



Pleasant Garden Elementary
A 20, 800 sqft addition that includes classrooms and a cafeteria.


Guilford Elementary
A new 89, 900 sqft building intended for a student body population of 750.



Parkview Elementary
This 26,406 sqft project includes six classrooms, a multipurpose room, a media center and various administrative spaces added on to an existing school site.


EP Pearce Elementary
A 89, 400 sqft school built on a new site, intended for a student body population of 750 students.



Oak View Elementary
A 19, 952 sqft addition of 11 classrooms.


HICAPS’ SERVICES
• Construction Manager / Owner’s Representative
• On-site Project Management
• Cost Estimating
• Customer / Design Coordination
• Bid Process Management
• Value Engineering Management
• Construction Management
• Schedule Management
• Move-in Coordination
• Project Closeout

Tuesday, April 28, 2009

Finished Project Update: The Crossings at Alexander

In July of 2008 we completed work on The Crossings at Alexander, a 300 unit luxury apartment complex located in Raleigh, NC. The 15 acre space is home to 25 buildings including: 10 main apartment buildings, 12 carriage houses (2 unit, 8 bay garage apartments) 1-4 bay garage with handicap units, clubhouse /gym with attached mail kiosk, pool, and maintenance building.

Take a look at the finished project at http://www.thecrossingsatap.com/index.htm

aerial view of work in progress

HICAPS’ SERVICES
• Construction Manager / Owner’s Representative
• On-site Project Management
• Cost Estimating
• Bid Process Management
• Value Engineering Management
• Construction Management
• Schedule Management
• Move-in Coordination
• Project Closeout

For more information on this project, please contact us at info@hicaps.com or (336)665-1234